少妇人妻系列1~100,欧美性色黄大片a级毛片视频 ,亚洲熟妇AV日韩熟妇在线,精品国产制服丝袜高跟

Welcome to Hunan Zhengyang Photoelectric Technology Co. Ltd!

中文| English

Project cooperation

Home> Project cooperation

Project operation process

Project operation process
employment objectivejob contentExecutive department
Preparatory stage

Through the newspaper network exhibition and other media to do the company's advertising

Market advertising department

Find target customersInitiate and participate in customer follow-up for lighting engineering with strong demand and affordability

Market development department

Understand customer needsAnalysis of the target building drawing - understanding the architectural designer's intentProject planning department

Effect design department


Project Department
Communicate with the structural engineer to understand the architectural features
Communicate with electrical engineer to understand distribution load

Field reconnaissance of the project, the overall environment of photography, and some pictures to ensure completion of the building after the completion of the project / lighting effect in harmony with the surrounding environment


Seek advice from customers and related departments / reference for follow-up work.
Analyze customer requirementsAnalyze customer requirements for the project
Analyze the performance requirements of designers and customers
Analysis of the characteristics of the project structure - the full use of favorable factors
Analysis of the surrounding environment, major roads and traffic flow direction
Analysis of the main view of the people around the building
Organize / summarize / study the information collected on the site - sketch
Interim Design StageAccording to the standard of urban building flood lighting, combined with the integration of general lighting and individual lightingEffect design department



Combining the advanced lighting concept with power economy

The combination of night lighting and daytime environment

Calculation of different parts of the building illumination / light / color temperature / color

Choose a reasonable lighting: LED/ floodlight

Interior lighting / dynamic lighting highlights green lighting

The simulation results of different schemes are designed according to the parameters such as elevation / illuminance / light / color temperature / color and so on
Submission of drawingsPlanning plan / overall effect map / local renderings / functional zoning map

Electrical drawings / construction scheduleProject Department
Submission of documentsDescription of the plan, reasonable investment estimation, electrical design requirementsProject budget department
Scheme determinationCustomer feedback / further refinement / implementationProject planning department



Later work contentFive points design, construction of five pointsProject planning department
Prior to constructionInsured property / personal accident insurance, to ensure that the interests of customers are not compromisedProject finance department
During constructionStrictly follow the ISO90001 quality management systemProject planning department

Conscientiously implement the construction specifications and process standardsProject Department
Final acceptance handoverSubmit a complete set of construction and acceptance program text to customer

Responsible for the relevant personnel training system
Service maintenanceProject free warranty period of one year / regular return visitCustomer service department

Once a year, the commissioning of lamps and cleaning servicesEngineering maintenance department

All-weather response to customer service needsCustomer service department


平山县| 新野县| 漾濞| 泸溪县| 清涧县| 临夏县| 安阳县| 屯留县| 普兰县| 如东县| 赫章县| 界首市| 平昌县| 报价| 富锦市| 达日县| 临沂市| 乐都县| 江陵县| 民县| 武陟县| 乐至县| 简阳市| 潢川县| 德钦县| 大兴区| 泸州市| 洪雅县| 东莞市| 分宜县| 赣榆县| 尖扎县| 盐亭县| 新竹市| 朝阳区| 右玉县| 濮阳县| 栾城县| 海安县| 平塘县| 深泽县|